GWEMBE, 1928, 26' Minett-Shields Long Deck Launch
|
Plank Replacement Above & Below Water Line
1 Damaged planks have been removed. 2 Two new planks fitted and riveted to ribs, rivet holes plugged. New planks are faired to match the hull shape and sanding is complete. 3 Stain is matched to existing stain and applied to new planks. 4 Bottom paint is renewed. 5 Waterline is painted. 6 Plank repair is complete. |